25 MW GAS TURBINE

Sold

25 MW GAS TURBINE

Description

GAS TURBINE GE MOD .. 7LM 2500 PH STIG GAG 08 Installed new in 2000 Less than 2000 hours of work Excellent condition, recently inspected report with favorable boroscopic test, available to be examined on the place. With ANSALDO ABB GENERATOR, new in 2001, capacity 29680 KVA, 50 HZ. It is possible to convert the turbine from PH to PE with moderate costs.

Specifications

ManufacturerUnknown
ConditionUsed